Broadband & connectivity

Business broadband that matches the site, not a residential headline speed.

From a single office to a multi-site rollout, we compare part-fibre, full-fibre and copper options so you get the right speed, reliability and contract — without chasing providers yourself.

No upfront quote fee. No obligation. Clear next steps before you switch.

1Gbps

Full-fibre options up to 1Gbps, subject to availability at the premises.

DDoS

Standard DDoS protection included on every connectivity product.

2027

Unaffected by the traditional phone-line switch-off.

Who it is for

Built around how the site actually works

We match the product to the premises, the team, and the contract you already have — not a generic package.

  • Offices that need reliable day-to-day broadband without paying for a dedicated circuit.
  • Sites still on ADSL or FTTC that need a future-proof replacement.
  • Businesses that want a VoIP phone service on top of the connection.
  • Multi-site teams that want one conversation instead of a provider per location.

The range

The types of connection

Options explained in plain English. Pricing is quoted to your sites and term — we do not publish a public rate card.

Part-fibre (SoGEA-style)

Uses the same technology as FTTC but does not need a traditional phone line, so you are not paying for a line you may never use. A VoIP phone service can still run over the top, and it is unaffected by the 2027 switch-off. Typical speeds include 40Mbps and 80Mbps packages.

Full-fibre (FTTP)

Fibre all the way to the premises, with ultrafast options from 100Mbps up to 1Gbps where the network is available. This is the natural replacement for ADSL and FTTC, which are being retired.

Ultrafast part-fibre (G.fast)

A single-order, faster part-fibre connection than standard FTTC — typically 150Mbps or 300Mbps. It is only available to premises within about 500 metres of the exchange, so we check availability before recommending it.

Copper broadband

Still available where fibre has not reached the site. The underlying technology cannot be voice-enabled, so if you still need phone service we will pair it with hosted voice on a different path, or look at fibre and Ethernet instead.

Included

What is included

  • One static IP on every broadband product, with extra addresses available in blocks if you need them.
  • Standard DDoS protection with round-the-clock monitoring and automatic mitigation of common attacks.
  • A router on 24- and 36-month contracts — activation and router charges apply on 12-month terms.
  • Availability checking before we recommend a product, including whether ultrafast part-fibre can reach the site.
  • Plain-English comparison of speed, contract length, install timelines and support.

Worth knowing

Get ready for the phone-line switch-off

Traditional analogue phone lines (PSTN and ISDN) are being retired, with the switch-off due in 2027. Part-fibre, full-fibre and Ethernet broadband are unaffected — and they are the foundation for hosted voice if you still need a business number.

In practice

How we help you choose

We start with the premises

Speed depends on what the network can actually deliver to your address. We check availability, then shortlist products that can be installed — not headline packages you cannot get.

Voice and data together

If you still use a landline, we look at whether hosted voice should sit on the same broadband, or whether the site needs a dedicated circuit first. Copper broadband cannot carry voice.

Upgrade paths

If you are on part-fibre today and full-fibre is coming, we explain the difference, the install, and whether an early move is worth it — before you sign a new term.

Questions

What should I know before I request a quote?

Part-fibre packages typically cover 40Mbps and 80Mbps. Full-fibre runs from 100Mbps up to 1Gbps where available. Ultrafast part-fibre offers 150Mbps and 300Mbps close to the exchange. We confirm what your postcode can take before quoting.

Ready when you are

Get a clearer comparison before you renew.

Request a free quote

Request a call back

Leave your contact details and a short note about your enquiry. We will call you back as soon as we can.